Brew Day Essentials
Complete Brew Day Checklist
3 min read
मा 03, 2026 को अपडेट किया
Your Brew Day Blueprint
This comprehensive checklist covers every step of an all-grain brew day. Print it, check off each item, and enjoy a smooth, stress-free session.
Night Before
- Recipe reviewed and printed
- All ingredients measured and organized
- Grain crushed (or scheduled for morning)
- Yeast removed from fridge (or starter prepared 24-48 hours ahead)
- Strike water volume calculated
- Sparge water volume calculated
- Equipment inspected and ready
Setup (30 minutes before)
- Workspace cleaned and prepared
- Kettle and mash tun in position
- Thermometer calibrated
- Sanitizer mixed (Star San or Iodophor)
- Fermenter, airlock, and tubing sanitized
- Scale zeroed
- Timer or phone ready
- Notebook and pen for recording gravity and notes
Mash (60-90 minutes)
- Strike water heated to calculated temperature
- Grain added to strike water (dough-in)
- Mash temperature verified (target: 148-158 F)
- Timer started for 60-minute rest
- Temperature checked at 15 and 30 minutes (adjust if needed)
- Mash-out to 168 F (optional)
Lautering and Sparging (30-60 minutes)
- Vorlauf: recirculate until wort runs clear
- Begin collecting wort in the kettle
- Heat sparge water to 168-170 F
- Sparge grain bed (fly or batch method)
- Stop sparging when runoff drops below 1.010 or target volume reached
- Record pre-boil gravity and volume
The Boil (60-90 minutes)
- Bring wort to a rolling boil
- Watch for and manage boil-over
- Add bittering hops at 60 minutes
- Add flavor hops at 15-30 minutes
- Add fining agents (Whirlfloc/Irish moss) at 15 minutes
- Sanitize immersion chiller in the boil (last 15 minutes)
- Add aroma hops at 5 minutes or flame-out
- Record post-boil volume
Cooling (15-30 minutes)
- Begin chilling immediately after flame-out
- Stir gently to improve heat transfer
- Cool to fermentation temperature (65-70 F for ales)
- Whirlpool and let trub settle (10 minutes)
Transfer and Pitch
- Transfer clear wort to sanitized fermenter
- Leave trub behind in the kettle
- Take OG reading and record
- Aerate wort (shake, pump, or oxygen)
- Pitch yeast at or below target fermentation temperature
- Seal fermenter and attach airlock
- Place fermenter in temperature-controlled location
Cleanup (30-45 minutes)
- Rinse kettle and mash tun with hot water
- Clean wort chiller
- Wash all tools and utensils
- Dispose of spent grain
- Wipe down surfaces and mop floor
- Inspect equipment for wear
- Store equipment clean and dry
Post-Brew Day
- Record all notes (OG, volumes, temperatures, timing, observations)
- Monitor fermentation temperature
- Check airlock activity within 24 hours
- Plan gravity reading at day 7-10
- Relax, have a homebrew, and wait