BeerFYI

Brew Day Essentials

Complete Brew Day Checklist

3 min read Güncellendi Mar 03, 2026

Your Brew Day Blueprint

This comprehensive checklist covers every step of an all-grain brew day. Print it, check off each item, and enjoy a smooth, stress-free session.

Night Before

  • Recipe reviewed and printed
  • All ingredients measured and organized
  • Grain crushed (or scheduled for morning)
  • Yeast removed from fridge (or starter prepared 24-48 hours ahead)
  • Strike water volume calculated
  • Sparge water volume calculated
  • Equipment inspected and ready

Setup (30 minutes before)

  • Workspace cleaned and prepared
  • Kettle and mash tun in position
  • Thermometer calibrated
  • Sanitizer mixed (Star San or Iodophor)
  • Fermenter, airlock, and tubing sanitized
  • Scale zeroed
  • Timer or phone ready
  • Notebook and pen for recording gravity and notes

Mash (60-90 minutes)

  • Strike water heated to calculated temperature
  • Grain added to strike water (dough-in)
  • Mash temperature verified (target: 148-158 F)
  • Timer started for 60-minute rest
  • Temperature checked at 15 and 30 minutes (adjust if needed)
  • Mash-out to 168 F (optional)

Lautering and Sparging (30-60 minutes)

  • Vorlauf: recirculate until wort runs clear
  • Begin collecting wort in the kettle
  • Heat sparge water to 168-170 F
  • Sparge grain bed (fly or batch method)
  • Stop sparging when runoff drops below 1.010 or target volume reached
  • Record pre-boil gravity and volume

The Boil (60-90 minutes)

  • Bring wort to a rolling boil
  • Watch for and manage boil-over
  • Add bittering hops at 60 minutes
  • Add flavor hops at 15-30 minutes
  • Add fining agents (Whirlfloc/Irish moss) at 15 minutes
  • Sanitize immersion chiller in the boil (last 15 minutes)
  • Add aroma hops at 5 minutes or flame-out
  • Record post-boil volume

Cooling (15-30 minutes)

  • Begin chilling immediately after flame-out
  • Stir gently to improve heat transfer
  • Cool to fermentation temperature (65-70 F for ales)
  • Whirlpool and let trub settle (10 minutes)

Transfer and Pitch

  • Transfer clear wort to sanitized fermenter
  • Leave trub behind in the kettle
  • Take OG reading and record
  • Aerate wort (shake, pump, or oxygen)
  • Pitch yeast at or below target fermentation temperature
  • Seal fermenter and attach airlock
  • Place fermenter in temperature-controlled location

Cleanup (30-45 minutes)

  • Rinse kettle and mash tun with hot water
  • Clean wort chiller
  • Wash all tools and utensils
  • Dispose of spent grain
  • Wipe down surfaces and mop floor
  • Inspect equipment for wear
  • Store equipment clean and dry

Post-Brew Day

  • Record all notes (OG, volumes, temperatures, timing, observations)
  • Monitor fermentation temperature
  • Check airlock activity within 24 hours
  • Plan gravity reading at day 7-10
  • Relax, have a homebrew, and wait

Beverage FYI Ailesinin Parçası